Skip to content
Public Art & Commissions

Current commission

Sunnyvale, California

Data Center Building

Commissioned 2025

In progress — due for installation late 2026 – early 2027

Architectural rendering: a large square artwork in blue, green and copper tones on the façade of a pale building beside a tall glass entrance(open larger view)

Rendering: Gensler

01Data Center Building

About the project

A 48-foot-square work in powder-coated steel with ceramic frit printing for the façade of a new data center in Sunnyvale. A loose map of Silicon Valley, its bay shoreline and the grid of its towns, is filled with imagery from motherboards and lines of code, so that the region's geography and the circuitry that remade it read as one surface: a map of a new digital landscape, at the scale of the building that houses it.

Note

A current commission, not yet installed. Shown here with the artwork design and architectural renderings.

The work

Scale

48′ × 48′

To scale

Location
Sunnyvale, California
Commissioned by
Gensler Architecture
Materials
Powder-coated steel with ceramic frit printing
Commissioned
2025
Status
In progress — due for installation late 2026 – early 2027

Images

Architectural rendering, closer view: the artwork, a blue map of a shoreline over circuit-board patterns, on the building front beside a glass entrance, with people walking past(open larger view)

Rendering: Gensler

02Data Center Building

Artwork design: a square map in blue and teal, its coastline traced in white, layered with circuit-board imagery of copper traces and chips(open larger view)

Design

03Data Center Building

Inquire

Inquire about a commission like this

Or write directly to LisaLevinePhoto@yahoo.com; the message opens with Data Center Building in the subject line.